Reserves and Resources

 

 

Reserves (Mt)

Resources (Mt)

Bowen Basin Projects

Proven

Probable

Total

Measured

Indicated

Inferred

Total

Baralaba Mine

0.8

0.5

1.2

7.4

10.3 16 34

Baralaba North

 

6.4

6.4

7.4

15.5

23

46

Baralaba South

 

 

0

0

0

25

25

Wonbindi

 

25.8

25.8

0

44.7

19

64

Total Bowen Basin Projects

0.8

32.7

33.4

14.8

70.5

83

168

Surat Basin Projects

Proven

Probable

Total

Measured

Indicated

Inferred

Total

Bottle Tree

 

 

0

  29.5 

6

35

Collingwood

 

 

0

79.7

80.3

69

229

Davies Road

 

 

0

   

76

76

Krugers

 

 

0

   

105

105

Taroom

 

 

0

158.1

149.3

126

433

Tin Hut Creek

 

 

0

 

206.6

137

344

Woori

40.6

 

40.6

84.3

   

84

Total Surat Basin Projects

40.6

0

40.6

322.1

465.7

519

1,306

Other Projects

Proven

Probable

Total

Measured

Indicated

Inferred

Total

Kingaroy

 

 

0

35.5

128.3

114

278

Bylong

 

 

0

 

150

273

423

Hume

 

 

0

 

115

 

115

Total Other Projects

0

0

0

35.5

393.3

387

816

TOTAL ALL PROJECTS

52

32.7

74

372.4

929.5

906

2,290

 

*As at December 31,  2011 and reduced by subsequent production.